1. General provisions and scope of application

1.1. These Purchasing Terms shall apply exclusively. We do not recognise any deviating or conflicting general terms and conditions unless we have expressly agreed to them in writing.

1.2. The acceptance of goods or services (“contractual object”) from the Supplier or the payment thereof shall not constitute consent, even if the acceptance or payment is made with knowledge of conflicting or supplementary contractual terms of the Supplier.

1.3. These Purchasing Terms shall also apply to all future transactions between us and the Supplier. Likewise, any previously agreed contractual terms of the Supplier which conflict with or supplement these Purchasing Terms shall no longer be recognised.

1.4. These Purchasing Terms apply to business transactions with entrepreneurs, legal entities under public law and special funds under public law within the meaning of Sec. 310 (1) of the German Civil Code (BGB).

2. Supply contract – delivery call-off

2.1. Orders, agreements and delivery call-offs as well as any amendments and supplements thereto must be made in writing. We do not recognise verbal orders or agreements that have not been confirmed by us in writing. We shall only recognise deviations of the Supplier’s order confirmations from our order as part of the contract if the deviations are declared in writing in the order confirmation, are expressly and clearly identified as deviations and have been expressly approved by us in writing.

2.2. The written form shall also be satisfied by fax, data transmission or e-mail.

2.3. If the Supplier does not accept the order within two weeks of its receipt, we shall be entitled to revoke it. The revocation is not subject to the setting of a deadline. Delivery call-offs shall become binding at the latest if the Supplier does not object within two weeks.

2.4. We may require the Supplier to make changes to the delivery item in terms of design and execution, unless the requested changes are unreasonable for the Supplier, in particular with regard to the additional time or costs likely to be incurred by the Supplier as a result. The effects of reasonable changes, in particular with regard to additional and reduced costs as well as delivery dates, shall be settled appropriately by mutual agreement. If the Supplier declares that it is unable to implement the changes requested by us, we may withdraw from the contract. This shall not apply if the changes requested by us are unreasonable for the Supplier, in particular because we do not offer the Supplier reasonable compensation for the additional costs actually incurred by it as a result of the requested changes, or a reasonable postponement of the delivery date taking into account the delays likely to arise from the requested changes.

3. Delivery dates and deadlines, acceptance, passing of risk

3.1. Agreed dates and deadlines are binding. Decisive for compliance with the delivery date or the delivery period is the receipt of the goods by us. Unless delivery “free purchaser’s works” (DAP or DDP named place in accordance with Incoterms® 2020) has been agreed, the Supplier shall make the goods available in good time, taking into account the time required for loading and dispatch to be coordinated with the forwarding agent. If delivery “by collection” (EXW in accordance with Incoterms® 2020) has been agreed, the Supplier shall give early notice of the completion of the goods.

3.2. If the Supplier has assumed responsibility for installation or assembly, the Supplier shall bear all necessary expenses such as travel costs, provision of tools and expense allowances.

3.3. Upon expiry of the delivery date, the Supplier shall be in default even without a specific reminder, unless the Supplier proves that it is not responsible for the non-performance. In this case we shall be entitled, after setting a reasonable deadline for performance, to assert claims for damages in lieu of performance and/or to withdraw from the contract. Any contractual penalty payable by us as a result of the Supplier’s default shall be passed on to the Supplier.

3.4. In the event of a delay in delivery we shall also be entitled to demand lump-sum compensation for default in the amount of 0.3 % of the delivery value per completed working day, but no more than a maximum of 5 % of the order value. The Supplier has the right to prove to us that no damage or substantially less damage than the lump sum has been incurred as a result of the default. We are entitled to prove higher damages.

3.5. The Supplier is obliged to notify us immediately in writing if it foresees difficulties with regard to production, the supply of primary material, compliance with the delivery date or similar circumstances which could prevent it from delivering on time or in the agreed quality.

3.6. The unconditional acceptance of the delayed delivery or service shall not constitute a waiver of the claims for compensation to which we are entitled on account of the delayed delivery or service; this shall apply until full payment of the remuneration owed by us for the delivery or service concerned.

3.7. Partial deliveries are generally not permitted unless we have expressly agreed to them or they are reasonable for us.

3.8. If acceptance has been agreed, the acceptance shall be governed by the agreements made in the orders and delivery call-offs.

3.9. The risk of accidental loss and accidental deterioration of the goods shall pass to us upon handover at the place of delivery. Insofar as acceptance has been agreed, this shall be decisive for the passing of risk. In all other respects, the statutory provisions of the law on contracts for work and services shall apply accordingly in the event of an acceptance. Handover or acceptance shall be deemed equivalent if we are in default of acceptance.

4. Force majeure

4.1. Impediments to performance which are not attributable to the sphere of risk of one contracting party shall release the contracting parties from their performance-related obligations for the duration of the disruption and to the extent of its effect.

4.2. Such impediments to performance include, among others, force majeure, riots, acts of war or terrorism, epidemics, plagues or pandemics, strikes, industrial disputes including those at the plants of the contracting partners and their vicarious agents, and lockouts, official measures, blockades of transport routes, failures or restrictions of electronic data exchange caused by third parties, cybercrime by third parties, as well as other unforeseeable, unavoidable and serious events.

4.3. Both parties are obliged to provide each other without delay with the necessary and reasonable information and to temporarily adapt their obligations in good faith to the changed circumstances, in particular to any changed market requirements.

4.4. During such events we shall be entitled – without prejudice to our other rights – to withdraw from the contract in whole or in part in the event that an adjustment is not suitable.

4.5. Insufficient supply to the Supplier by its own suppliers shall not constitute a case of force majeure.

5. Packaging

5.1. Unless otherwise agreed, the goods to be delivered shall be packaged properly at the Supplier’s expense in a customary and appropriate manner or, at our request, provided with special packaging in accordance with our instructions.

5.2. The Supplier shall be liable for damage resulting from defective packaging.

5.3. The Supplier shall comply with the requirements of the German Packaging Act (VerpackG) at its own expense and shall ensure suitable packaging, registration and labelling, the latter also with regard to hazardous substances.

5.6. The Supplier shall take back used, residue-free packaging free of charge. Should this not be possible, it shall bear the corresponding reasonable disposal costs incurred by us.

6. Invoicing, payment and retention of title

6.1. Unless different payment terms have been agreed in an individual case, our payments shall be made after receipt of the proper and verifiable invoice, at our discretion, within 14 calendar days with a 3 % cash discount or within 45 calendar days strictly net. If the goods are received later than the invoice, the cash discount period shall only commence on the date of receipt of the goods. We reserve the right to make payments by our own acceptance or bill of exchange.

6.2. The invoice must contain the mandatory information pursuant to the German Value Added Tax Act (UStG), in particular the tax number issued by the tax office or the VAT identification number issued to it by the Federal Office of Finance, as well as the order number and the supplier number. If these requirements are not met, we shall not be responsible for the resulting delays in invoice processing and payment settlement. We reserve the right to reject invoices that are not in proper form.

6.3. In the event of a defective delivery we shall be entitled to withhold payment until proper fulfilment.

6.4. The shipping instructions noted in the order must be strictly observed. In the event of non-compliance with the shipping instructions, the additional costs incurred as a result shall be borne by the Supplier.

6.5. The Supplier is not entitled to assign its claims to third parties or to have them collected by third parties without our prior written consent.

6.6. All agreed prices include all expenses associated with the order, irrespective of whether these were foreseeable at the time the contract was concluded.

6.7. We generally reject payment settlement by cash on delivery.

6.8. Unless otherwise agreed in writing, customs duties and other charges shall be borne by the Supplier.

6.9. Title to the delivered goods shall pass to us upon payment in full by us. Any extended or expanded retention of title on the part of the Supplier is excluded. We are entitled to resell and process the goods within the scope of ordinary business operations.

6.10. The Supplier is obliged to disclose to us without delay any rights of third parties to the goods or parts thereof. This shall also apply to possible assignments of claims.

7. Set-off and retention

7.1. We are entitled to rights of set-off and retention to the extent provided by law.

7.2. The Supplier shall only be entitled to a right of set-off if its counterclaim has been established as final and absolute, is undisputed, acknowledged or ready for decision. Furthermore, it shall be entitled to exercise a right of retention insofar as its counterclaim has been established as final and absolute, is undisputed or ready for decision and is based on the same contractual relationship.

8. Quality

8.1. For its deliveries and services, the Supplier shall comply with the recognised rules of technology (in particular DIN standards, VDE regulations, VDI guidelines, DVGW rules), the applicable safety regulations and product safety requirements as well as the agreed technical specifications. All delivered goods must correspond to the current state of the art and to the statutory regulations and standards applicable in the country of manufacture and distribution.

8.2. Products subject to labelling requirements under EU directives must be supplied with the corresponding CE marking and declaration of conformity.

8.3. Changes to the delivery item and deviations from the agreed quality require our prior written consent.

8.4. If the Supplier manufactures the contractual object for us, the Supplier is obliged to inform us accordingly if it considers the contractual object to be manufactured by it to be unsuitable or not optimally suitable for the intended purpose. In this respect, the Supplier shall be deemed the expert for the parts to be manufactured by it.

8.5. Deviations from the ordered specification in the case of initial samples or series production must be notified by the Supplier prior to delivery; delivery may only take place after written approval by us.

9. Notification of defects

9.1. Immediately after receipt of the delivery we shall carry out an identity and quantity check and inspect the delivery for obvious damage (including transport damage). If we discover a defect in the process, we shall notify the Supplier thereof without delay. We shall notify the Supplier of defects not discovered in this process within a reasonable period, as soon as they are identified in the course of ordinary business operations. In this respect the Supplier waives the objection of late notification of defects.

9.2. Goods not delivered in accordance with the order will be returned at the Supplier’s expense and risk.

9.3. Payments or partial payments of the purchase price or of the remuneration shall constitute neither an acceptance nor an acknowledgement that the contractual object is free of defects.

10. Liability for material defects (warranty)

10.1. The Supplier warrants that the delivered goods are free of defects, in particular that they have the agreed quality and condition pursuant to clauses 8.1 and 8.2, that the design, suitability and production technology of the goods and/or services comply with the relevant recognised rules and the latest state of science and technology, and that only material of first-class and suitable quality has been used which is appropriate for the intended purpose. The agreed quality shall include in particular the properties and characteristics of any purchase samples and compliance with all relevant statutory and official regulations applicable at the place of destination for the deliveries and/or services. Furthermore, the Supplier warrants that the delivered goods do not give rise to product liability due to the existence of a product defect.

10.2. We are entitled to the statutory claims for defects in full; in any case we are entitled to demand from the Supplier, at our discretion, either the rectification of the defect or the delivery of a new item. The right to damages, in particular the right to damages in lieu of performance, is expressly reserved.

10.3. Should the Supplier not commence with the rectification of the defect following our request to remedy the defect, or should the rectification fail, we shall be entitled in urgent cases, after setting a reasonably short deadline for remedy, in particular in order to avert acute dangers or to avoid major damage, to carry out the rectification ourselves or to have it carried out by third parties at the Supplier’s expense.

10.4. If the same goods are repeatedly delivered defective, we shall be entitled, after setting a reasonable deadline for performance, to withdraw from the contract in the event of a further defective delivery, also with regard to the unfulfilled scope of delivery.

10.5. The expenses necessary for the purpose of subsequent performance, in particular transport, labour, travel and material costs, shall be borne by the Supplier. A limitation of the costs to the order value will not be accepted.

10.6. The parts to be replaced by the Supplier shall be made available to it by us on request and at its expense. Returns of goods complained about carried out by us at the Supplier’s request shall be made for the account and at the risk of the Supplier. The risk shall pass to the Supplier at the time of handover to the commissioned forwarding agent, the carrier or the other company designated to carry out the shipment.

10.7. The Supplier shall be responsible for the fault of its sub-suppliers as for its own fault.

10.8. In each case of the processing of a warranty claim by us, the Supplier shall, insofar as it is responsible for the defect, be obliged to pay lump-sum damages of EUR 100.00 (without prejudice to our right to assert higher damages in an individual case). The Supplier shall in any case be entitled to prove that we have incurred no damage or only minor damage.

10.9. If, in our capacity as an automotive supplier, we undertake a longer-lasting or more extensive liability for defects vis-à-vis one of our customers, the Supplier shall, insofar as it supplies production material, be obliged to accept this provision for the future as well, following prior written notification.

10.10. Insofar as our customers – generally automobile manufacturers – use a reference market procedure or a similar procedure customary in the automotive industry for determining and settling warranty claims and assert such claims against us for defects in our products resulting from defects in the Supplier’s goods, this procedure shall also be applied to the supply relationship between the Supplier and us.

11. Supplier recourse

11.1. Our statutory rights of recourse within a supply chain (supplier recourse pursuant to Secs. 445a, 445b, 478 BGB) are available to us without restriction in addition to our claims for defects.

11.2 We are in particular entitled to demand from the Seller exactly that type of subsequent performance (rectification or replacement delivery) which we owe to our customer in the individual case. Our statutory right of choice (Sec. 439 (1) BGB) is not restricted hereby.

11.3. Before we acknowledge or fulfil a claim for defects asserted by our customer (including reimbursement of expenses pursuant to Secs. 445a (1), 439 (2) and (3) BGB), we shall notify the Seller and, providing a brief description of the facts, request a written statement. If a substantiated statement is not made within a reasonable period and no amicable solution is reached, the claim for defects actually granted by us shall be deemed owed to our customer. In this case the burden of proof to the contrary shall lie with the Seller.

11.4. Our claims arising from supplier recourse shall also apply if the defective goods have been further processed by us or by another entrepreneur, e.g. by installation into another product.

12. Liability, product liability and recall

12.1. The Supplier shall compensate us for any damage incurred by us directly or indirectly as a result of a defective or incomplete delivery, due to a breach of official safety regulations or for any other reasons for which the Supplier is responsible.

12.2. If the Seller is responsible for product damage, it shall indemnify us against claims of third parties insofar as the cause lies within its sphere of control and organisation and it is itself liable in relation to third parties.

12.3. Within the scope of its indemnification obligation, the Seller shall reimburse expenses pursuant to Secs. 683, 670 BGB arising from or in connection with claims by third parties, including recall campaigns carried out by us. We shall inform the Seller of the content and scope of recall measures – insofar as this is possible and reasonable – and give it the opportunity to comment. Further statutory claims remain unaffected.

12.4. Unless a separate agreement has been concluded, the Supplier undertakes to maintain product liability insurance with a lump-sum cover of at least EUR 30 million per personal injury/property damage – lump sum. The extent of the contractual and statutory liability remains unaffected by the scope of the insurance cover.

13. Limitation period

13.1. The mutual claims of the contracting parties shall become time-barred in accordance with the statutory provisions, unless otherwise stipulated below.

13.2. Notwithstanding Sec. 438 (1) no. 3 BGB, the general limitation period for claims for defects shall be 3 years from the passing of risk. Insofar as acceptance has been agreed, the limitation period shall commence upon acceptance. The 3-year limitation period shall also apply accordingly to claims arising from defects of title, whereby the statutory limitation period for third-party claims in rem for restitution (Sec. 438 (1) no. 1 BGB) remains unaffected; moreover, claims arising from defects of title (clause 17.) shall in no case become time-barred for as long as the third party can still assert the right against us – in particular in the absence of limitation.

13.3. The limitation periods under sales law, including the above extension, shall apply – to the extent provided by law – to all contractual claims for defects. Insofar as we are also entitled to non-contractual claims for damages on account of a defect, the regular statutory limitation period (Secs. 195, 199 BGB) shall apply, unless the application of the limitation periods under sales law leads to a longer limitation period in the individual case.

13.4 For indemnification claims the limitation period shall be three years. It shall commence at the end of the year in which the claim arose and in which we obtained knowledge of the circumstances giving rise to the claim and of the identity of the debtor, or should have obtained such knowledge without gross negligence. Any longer statutory limitation periods shall take precedence.

14. Hazardous substances (REACH/CLP/RoHS)

14.1. Insofar as Regulations EC No. 1907/2006 of 18 December 2006 (“REACH Regulation”) and EC No. 1272/2008 of 16 December 2008 (“CLP Regulation”) are applicable, the Supplier warrants that all substances contained in the delivered goods are effectively pre-registered, registered and authorised in accordance with the REACH Regulation and the CLP Regulation, including all supplements, amendments and guidelines and all national laws applicable in connection with the REACH Regulation or the CLP Regulation, in compliance with the relevant requirements of the REACH Regulation or the CLP Regulation.

14.2 The Supplier warrants that it will provide us with every delivery with a current and complete safety data sheet that complies with the requirements of the REACH Regulation and the CLP Regulation.

14.3 The Supplier further warrants that, if articles delivered to us contain a concentration of more than 0.1 % by mass (w/w) of one or more substances which meet the criteria of Articles 57 and 59 of the REACH Regulation, it will provide us with sufficient information for the safe use of the articles.

14.4 Suppliers delivering goods from outside the European Union into the European Union undertake to carry out the necessary registrations for products named in Title II of the REACH Regulation and, in accordance with Article 8 of the REACH Regulation, to appoint an only representative who will fulfil the obligations of an importer arising from Title II of the REACH Regulation.

14.5. Insofar as the delivered goods fall under the requirements of Directive 2011/65/EU of 8 June 2011 on the restriction of the use of certain hazardous substances in electrical and electronic equipment (Restriction of Hazardous Substances – RoHS), the Supplier warrants that it will comply with its requirements as well as with the national implementations thereof, in particular with the German Ordinance on the Restriction of the Use of Hazardous Substances in Electrical and Electronic Equipment (Elektro- und Elektronikgeräte-Stoff-Verordnung – Elektro-StoffV).

14.6 In the event that the Supplier breaches any of the obligations under this clause 14, the Supplier shall indemnify us as well as our customers against all costs, third-party claims (in particular direct or indirect claims for damages) and other disadvantages (e.g. fines) arising from the breach of this clause 14. Costs of legal action are included. This shall not apply if the Supplier is not responsible for this breach of duty. Furthermore, we shall be entitled at any time to cancel the relevant order immediately and to refuse acceptance of the relevant delivery without incurring any costs. Any claims for damages that may exist remain unaffected hereby. A cancellation or refusal of acceptance shall not constitute a waiver of any claims for damages.

15. Industrial property rights

15.1. The Supplier undertakes to satisfy itself to a reasonable extent that no rights or know-how of third parties are infringed in connection with its delivery/service and/or its intended use by us.

15.2. The Supplier shall compensate us for all damages incurred by us as a result of the infringement of rights or know-how of third parties within the Supplier’s home country, the Federal Republic of Germany, a member state of the European Union or the United States of America in connection with its delivery/service and/or its intended use by us, unless the Supplier is not responsible for the damage incurred by us as a result of such an infringement of rights.

15.3. If a third party asserts claims against us for an infringement of its rights or its know-how which is attributable to deliveries/services of the Supplier and/or their intended use by us, the Supplier shall be obliged to indemnify us against these claims and against all reasonable expenses incurred by us arising from or in connection with a defence against the claim, insofar as the Supplier is liable for damages pursuant to clause 15.2.

15.4. The contracting parties undertake to inform each other without delay of any infringement risks and alleged cases of infringement that become known and to give each other the opportunity to counter corresponding claims by mutual agreement.

15.5. The limitation of claims arising from this clause 15 shall be governed by clause 15.2 sentence 2.

15.6. The Supplier’s warranty for defects of title pursuant to clauses 15.1 to 15.4 does not extend to such services or parts of services which have been manufactured according to our special specifications. As soon as the Supplier has reason to suspect that third-party industrial property rights are infringed by our specifications, it shall notify us thereof without delay.

16. Confidentiality & information security

16.1. The contracting parties undertake to treat all non-obvious commercial and technical details which become known to them through the business relationship as a trade secret.

16.2. All drawings and calculations provided for the execution of orders shall remain our property and must always be returned to us after the execution of the order.

16.3 Information and IT security is an essential component of the business processes and supply chains for us and our customers. The implementation of information and IT security requirements depends on the information that we exchange along the value chain. Where the processed information has a corresponding protection requirement, the contracting party is obliged to build up its information security on the basis of the VDA ISA. As a minimum, the information security checklist provided for suppliers and service providers or a self-assessment based on the VDA ISA questionnaire published by the German Association of the Automotive Industry (VDA) must be carried out and made available.

16.4. Sub-suppliers must be obligated accordingly.

17. Export control and customs

17.1. The Supplier is obliged to inform us in writing, without being requested to do so, whether its goods are subject to authorisation under the respectively applicable German, European (EU) and US (re-)export control regulations. For this purpose the Supplier must provide us with the following information and data in writing:

  • if listed, the export list item number (number) of the respectively valid annex to the German Foreign Trade and Payments Ordinance or comparable list items of the relevant European export lists (Regulation (EU) Dual-Use 2021/821) must be provided,
  • if the goods are subject to the “U.S. Export Administration Regulations” (EAR), the Export Control Classification Number (ECCN) pursuant to the U.S. Commerce Control List (CCL) must be provided,
  • the statistical commodity code (HS/CN code),
  • the country of origin (commercial policy/non-preferential origin), key for origin identifier: D = third country / E = EU / F = EFTA,
  • submission of a (long-term) supplier’s declaration on preferential origin (for EU suppliers) or preference certificates (for non-EU suppliers),
  • all other foreign trade law information and data that we require for the import and, if applicable, export of the goods.

The Supplier is obliged to inform us in writing without delay of all changes to the above information and data.

17.2. The Supplier shall fully indemnify us against all claims asserted against us by authorities or other third parties due to non-compliance with or breach of the obligations set out in clause 17.1.

17.3. The Supplier further undertakes to reimburse us immediately and on first demand for all damages and expenses (e.g. additional charges (such as import and export duties), fines and other financial disadvantages) incurred by us due to a culpable breach of its obligations under 17.1 and 17.2. Costs of legal action are included.

18. Compliance, social responsibility and sustainability

18.1. The Supplier undertakes, within the business relationship with us, neither to offer or grant nor to demand or accept, in business dealings or in dealings with public officials, any advantages which violate applicable anti-corruption regulations.

18.2. The Supplier undertakes, within the business relationship with us, not to enter into any agreements or concerted practices with other companies which have as their object or effect the prevention, restriction or distortion of competition under the applicable antitrust regulations.

18.3. The Supplier warrants the payment of an appropriate wage and of equal pay for work of equal value without distinction, as well as compliance with the respectively applicable laws governing the general minimum wage, and will obligate the sub-suppliers commissioned by it to the same extent. The Supplier confirms that it fulfils – insofar as applicable – the statutory requirements of the German Minimum Wage Act (MiLoG) and pays the respective minimum wage to its employees to whom the MiLoG applies.

18.4. The Supplier shall comply with the respectively applicable statutory regulations and ordinances on environmental protection, health and safety at work, on the treatment of employees as well as on the protection of human rights (in particular concerning the protection of international human rights, the abolition of forced and child labour, the elimination of discrimination in employment and occupation, as well as responsibility for the environment), including the internationally applicable minimum labour standards, in particular all conventions of the International Labour Organization regarding employee rights, working hours and occupational health and safety.

18.5 The Supplier undertakes to comply with the provisions on conflict minerals set out in Section 1502 of the “Dodd-Frank Wall Street Reform and Consumer Protection Act” (“Dodd-Frank Act”) as well as with Regulation (EU) 2017/821 of 17 May 2017 laying down supply chain due diligence obligations for Union importers of tin, tantalum and tungsten, their ores, and gold originating from conflict-affected and high-risk areas. The Supplier further undertakes to identify the use of so-called conflict minerals within the meaning of the Dodd-Frank Act (tin, gold, tantalum, tungsten) in its supply chain and to ensure by suitable measures that the delivered goods do not contain any conflict minerals pursuant to Section 1502 of the Dodd-Frank Act and Regulation (EU) 2017/821.

18.6. In all other respects, the Supplier shall comply with all statutory and official regulations with regard to environmental protection when fulfilling its contractual obligations.

18.7. The Supplier shall ensure that all subcontractors and agents engaged by it which are involved in any form in the manufacture of the goods delivered by it to us and/or in the provision of services to us will comply with the obligations listed in clauses 18.1 to 18.6 above.

18.8. The Supplier shall answer enquiries regarding compliance with compliance requirements, social responsibility and sustainability in the supply chain within a reasonable period and in compliance with the specified formalities. In addition, in the event of a suspected breach of the obligations under clauses 18.1 to 18.6, the Supplier shall investigate possible breaches without delay, inform us of the investigative measures taken and, in justified cases, disclose the supply chain concerned. If the suspicion proves to be justified, the Supplier must inform us within a reasonable period of the internal company measures it has taken in order to prevent future breaches. If the Supplier fails to comply with these obligations within a reasonable period, we reserve the right to withdraw from contracts with it or to terminate them with immediate effect.

18.9. The Supplier must make it possible for compliance with clauses 18.1 to 18.6 to be monitored by us ourselves or by third parties bound to secrecy. For this purpose the Supplier shall, at our request, provide information without delay, make available all necessary information (e.g. documents) without delay and, after reasonable prior notice, enable us or third parties commissioned by us to inspect and/or investigate the facts on site.

18.10. In the event that the Supplier breaches any of the obligations under this clause 18, clause 14.7 shall apply accordingly.

19. General provisions

19.1. The Supplier may not assign or transfer any order or individual contract, either in whole or in part, without our prior written consent.

19.2. The Supplier may not engage one or more subcontractors for the fulfilment of an order or of a part of an order without our prior written consent.

19.3. The place of performance is our registered office (Veitshöchheim) or, insofar as the delivery is ordered by one of our branch offices, its registered office. Something different may be agreed for the delivery in an individual case. The place of payment is our registered office (Veitshöchheim).

19.4. Should a provision of these Purchasing Terms and of the further agreements made be or become invalid, the validity of the remaining terms shall not be affected thereby. The contracting parties are obliged to replace the invalid provision with a provision that comes as close as possible to it in economic terms.

19.5. The law of the Federal Republic of Germany shall apply exclusively, to the exclusion of the provisions of the United Nations Convention on Contracts for the International Sale of Goods of 11 April 1980 (CISG).

19.6. In the event of all disputes arising from the contractual relationship, including actions in documentary, bill of exchange and cheque proceedings, if the Supplier is a registered merchant, a legal entity under public law or a special fund under public law, an action shall be brought before the court having jurisdiction for our head office (Veitshöchheim) or for our branch office which issued the order. We are also entitled to bring an action at the Supplier’s head office.

19.7. These Purchasing Terms are drawn up in the German and English languages. In the event of discrepancies between the two versions, the German version shall take precedence over the English version. The English version serves merely as a translation.

As at: April 2024